In preparation of a Utility Master Plan, experienced engineers evaluate the existing condition of the Utility Infrastructure, identify the system strengths and deficiencies; recommend the required upgrades for the estimated normal growth in the desired period of time, and suggest alternatives to mitigate deficiencies; and taking into consideration what the fiscal impact would be.

The following outlines what type of Master Plan Services we provide:

  • Electrical Distribution Systems
  • Cogeneration Systems
  • Utility Substations
  • Storm Drains
  • Chilled Water
  • Telecommunications
  • Water
  • Sanitary Sewer
  • Steam
  • Natural Gas

Utility Master Planning was prepared and completed for:

  • Electrical Distribution Systems
  • San Jose State University
  • California State University, Stanislaus
  • California State University, Dominguez Hills
  • California State University, Fullerton

Master Plan Studies are provided to determine the following:

  • Present Conditions
  • Immediate Requirements (0 - 3 Years)
  • Short-Term Goals (3 - 6 Years)
  • Mid-Range Goals (6 - 12 Years)
  • Long-Range Goals (12 - 20 Years)

Evaluation and methods for upgrading and updating the existing systems are provided to meet the above mentioned time-frames. An analysis of the fiscal impact for each improvement is provided; alternatives are suggested and discussed, to determine the advantage and disadvantage of each corrective measure.

We Make it Our Business
To Improve Your Business.

GET IN TOUCH